Residential New Construction
New Construction Drywall
Dependable hang & finish on production plans, at volume. Committed start dates and crews sized to your schedule.
Scope
Scope we cover.
One crew from stocking to punch list.
- Board delivery coordination
- Stocking
- Hanging walls & ceilings
- ½" and ⅝" Type X
- Moisture/mold-resistant board in wet areas
- Corner bead: metal, paper-faced, bullnose
- Taping
- Finishing to specified level
- Ceiling texture
- Garage fire-taping
- Pre-paint touch-ups
- Punch list
Specialties
Production homes, at volume.
- Repeat plans run the same way every time
- Crews sized to your starts
- Committed hang dates after insulation inspection
- Fire-taped garages and finished lower levels
Materials & specs
Materials & specs.
- Board
- ½" standard, ⅝" Type X, moisture/mold-resistant. [Owner to confirm brands.]
- Corner bead
- Metal, paper-faced, bullnose
- Compound
- [Owner to confirm setting-type and topping compounds]
- Finish levels
- Level 1–5, specified room by room
- Ceiling textures
- Smooth, knockdown, orange peel, skip trowel, hand texture
Process & timeline
Our process with builders.
- 1
Send plans.
PDF plan set, finish level, texture spec and target hang date. - 2
Takeoff & bid
A written number within [X] business days. - 3
Schedule hang
Booked after insulation inspection passes. - 4
Tape, finish & texture
To the level you specified, room by room. - 5
Final walk & punch
Checked under work lights with your super.
Builder FAQ
Questions builders ask.
Send a PDF plan set and we return a written number within [X] business days.
PDF plans, the finish level you want, the ceiling texture spec, and your target hang date.
[Owner to confirm current lead time.]
We run [X] crews and hang & finish roughly [XX,XXX] sq ft per week.
[Owner to confirm.] We coordinate board delivery and stocking either way.
Level 4 is standard in living spaces. Level 5 is priced room by room; we'll break it out on your bid.
Ready to bid it?
Request a BidBids returned within [X] business days.